These requests are not handled through the 311 system; they are considered Super Neighborhood Action Plan (SNAP) items. They require longer range planning and budgeting.
Requests costing less than $350,000 can be submitted through the Super Neighborhood Council or the City Councilmember.
Examples of projects less than $350,000 include:
Parks
- Tree planting & maintenance in esplanades ONLY
- Mulching of esplanades
Traffic
- Intersection Redesign
- Includes signal upgrades at intersections (upgrade signals heads, pedestrian heads)
- Change in traffic hardware (span wire to mast arm)
- Reconfigure existing intersection
Engineering and Construction
- Major Thoroughfare Street Overlays (asphalt)
- Concrete point repair through ROW/M
- Street will be evaluated prior to acceptance
Planning and Development
- Amendment/Removal of a Bike Lane/Route
- Bikeway Signs-crossing signs only on approved bikeways
Right of Way (ROW)/Maintenance
- Overlay of Neighborhood Streets –excludes concrete streets
- Concrete Point/Patch Repair –all thoroughfares and local streets (concrete streets only)
- Structural Flooding (call 311) (reoccurring events can be submitted for local drainage project evaluation)
|